|
Dharma Engineering Project Installing Tap Water, Tap water, Just finished digging the ground to find the main pipe, Both sides have been dug. Prepare to drill the hole to cross the pipe. |
![]() |
|
Drilling the hole and installing the pipe. Hard work isn't it ?, Installing the TAP Water in our land, Fresh water is coming out, Another picture that shows you the TAP Water has been installed successfully |
![]() |
|
Installing the water meters, Position Tap Water, Installing TAP Water done. Welcome a new customer. |
|
Visit more location exactly by Google Map as the bellow: |
| Tap water | Selamatan | Warehouse office | North land foundation | South land foundation | Wall permit |
Mr. Steven Knudson
Dharma Engineering
328 Leichhardt Street,
Rockhampton 4701 Australia